This hotel of 1,000 m2, was built in 2013 for a period of 3 months.
The selected system consists of wood panels, insulated by straw, this type of insulation was provided by the client.
The exterior coating was performed in larch cladding and the interior one included both paneling and plasterboard.

The hotel is located near Strasbourg.